RESTORATION OF THE HOLY MONASTERY OF THE ALL-POWERFUL BRIGADIER-GENERAL OF AEGIO

SPONSOR: HOLY DIOCESE OF KALAVRYTA AND AIGIALEIA LOCATION: PATRA BUDGET: 3.332.000,00 € CHRONOLOGY: 2008 -2009 Words to say about the project: full restoration of the Holy Monastery of Taxiarches. Excavation, removal, stripping, emptying, cleaning of canopies with care without the use of mechanical means. Dismantling-removal-removal of embedded elements. Special scaffolds for anti-scaffolding. Special reinforcement of […]
PEDESTRIANISATION, REDEVELOPMENT OF STREETS IN THE CENTRE OF CORINTH

SPONSOR: CITY OF CORINTHIA LOCATION: CORINTHOS BUDGET: 4.500.000,00 € CHRONOLOGY: 2009 -2010 WORDS ABOUT THE PROJECT: Redevelopment of the Historical Centre of the city of Corinth, covering an area of 40.000 sq.m. Construction of an extensive network of pedestrian streets
REDEVELOPMENT – DEVELOPMENT OF THE CAMPING AREA – AGUIA MOORS

SPONSOR: CITY OF PATRAS LOCATION: AGIA PATRAS BUDGET: 3.145.000,00 € TIMEFRAME: 2020 -2022 WORDS ABOUT THE PROJECT: Redevelopment – development of the marsh area of about 225 hectares. and conversion of the area into an Ecological Park
INTEGRATED URBAN DEVELOPMENT OF THE HISTORIC CENTRE OF PATRAS – ROUTE 2 (DOWNTOWN) AND ROUTE 3 (CYCLE PATH NETWORK)

SPONSOR: CITY OF PATRAS LOCATION: PATRA BUDGET: 11.824.000,00 € SCHEDULE: (in progress) A FEW WORDS ABOUT THE PROJECT: Redevelopment – development of the area of the Historical Centre of the city of Patras of an area of approximately 95.000 sq.m. and includes: reconstruction of pavements and vehicular traffic routes with asphalt carpet, reconstruction of pavements […]
SUBMARINE PIPELINE FOR THE DISPOSAL OF TREATED SEWAGE OF THE COASTAL SETTLEMENTS OF PREVEZA

PROMOTER: REGION OF EPIRUS LOCATION: PREVEZA CANAL BUDGET: 741.311,93 € TIMEFRAME: 2020 -2021 WORDS FOR THE PROJECT: Construction of a 1.800 m long underwater pipeline for the disposal of treated waste water with a PE pipe Φ355
DAMAGE RESTORATION, CLEANING & OPENING OF THE GRAVE OF GEROPOROS THEEV OF LESINIOS

PROMOTER: REGION OF ETOLOAKARNANIA LOCATION: LESINI, ETOLOAKARNANIA BUDGET: 3.101.054,41 € SCHEDULE: (in progress) LITTLE WORDS ABOUT THE PROJECT: dredging and widening of the 9,000 m long Geroporos ditch.
STUDY – CONSTRUCTION OF A RESERVOIR AT THE SITE OF DASKAS D. TRITAS

PROMOTER: THE PREFECTURAL ADMINISTRATION OF ACHAIA LOCATION. BUDGET: 7.000.000,00 € CHRONOLOGY: 2007 – 2014 A FEW WORDS ABOUT THE PROJECT: Construction of an earthen dam with a central impermeable core of clay material, with transitional filter and drainage zones on either side made of graded gravel, with the body of the dam made of gravel […]