{"id":1806,"date":"2023-08-17T10:02:05","date_gmt":"2023-08-17T10:02:05","guid":{"rendered":"https:\/\/ergo.314tester.eu\/construction-of-a-bypass-of-the-national-road-patras-tripoli-in-the-section-flooded-by-the-dam-of-%cf%80%ce%b5%ce%b9ros-parapirou\/"},"modified":"2023-08-17T10:02:05","modified_gmt":"2023-08-17T10:02:05","slug":"construction-of-a-bypass-of-the-national-road-patras-tripoli-in-the-section-flooded-by-the-dam-of-%cf%80%ce%b5%ce%b9ros-parapirou","status":"publish","type":"post","link":"https:\/\/ergodyn.gr\/en\/construction-of-a-bypass-of-the-national-road-patras-tripoli-in-the-section-flooded-by-the-dam-of-%cf%80%ce%b5%ce%b9ros-parapirou\/","title":{"rendered":"CONSTRUCTION OF A BYPASS OF THE NATIONAL ROAD PATRAS &#8211; TRIPOLI IN THE SECTION FLOODED BY THE DAM OF \u03a0\u0395\u0399ROS &#8211; PARAPIROU"},"content":{"rendered":"<p><strong>PROMOTER:<\/strong> MINISTRY OF INFRASTRUCTURE AND TRANSPORT<\/p>\n<p><strong>LOCATION:<\/strong> ASTERI ACHAIAS<\/p>\n<p><strong>BUDGET:<\/strong> 13.100.000,00 \u20ac<\/p>\n<p><strong>CHRONOLOGY:<\/strong> 2009 &#8211; 2011<\/p>\n<p>WORDS <strong>FOR THE PROJECT:<\/strong> Construction of a bypass of the National Road Patras &#8211; Tripoli in the section flooded by the waters of the reservoir that will be created with the Asterios dam, in order to ensure the continuity of the existing E.O.E. 111 (Patras &#8211; Tripoli)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>PROMOTER: MINISTRY OF INFRASTRUCTURE AND TRANSPORT LOCATION: ASTERI ACHAIAS BUDGET: 13.100.000,00 \u20ac CHRONOLOGY: 2009 &#8211; 2011 WORDS FOR THE PROJECT: Construction of a bypass of the National Road Patras &#8211; Tripoli in the section flooded by the waters of the reservoir that will be created with the Asterios dam, in order to ensure the continuity [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":1956,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35],"tags":[],"class_list":["post-1806","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-road-projects"],"_links":{"self":[{"href":"https:\/\/ergodyn.gr\/en\/wp-json\/wp\/v2\/posts\/1806","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ergodyn.gr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ergodyn.gr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ergodyn.gr\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ergodyn.gr\/en\/wp-json\/wp\/v2\/comments?post=1806"}],"version-history":[{"count":0,"href":"https:\/\/ergodyn.gr\/en\/wp-json\/wp\/v2\/posts\/1806\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ergodyn.gr\/en\/wp-json\/wp\/v2\/media\/1956"}],"wp:attachment":[{"href":"https:\/\/ergodyn.gr\/en\/wp-json\/wp\/v2\/media?parent=1806"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ergodyn.gr\/en\/wp-json\/wp\/v2\/categories?post=1806"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ergodyn.gr\/en\/wp-json\/wp\/v2\/tags?post=1806"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}